Carrick-On-Suir Municipal District

Featured

By administrator, 7 May, 2024

Tipperary County Council is preparing a new Local Area Plan for Carrick-on-Suir, which will set out the land use strategy for the town to ensure the town can grow, support employment and homes and can do so sustainably and successfully.

The Council is inviting submissions from the public to identify priorities and help shape the future development of the town. This stage represents the ‘issues’ stage before a draft of the Local Area Plan is published. An Issues Paper has been produced to help inform submissions and sets out:

By administrator, 22 January, 2024

Development of new carpark in the townland of Townparks, between Chapel St.(identified as L6711 New Lane on GIS system) and Stable Lane, North of Main St. Carrick on Suir, Co. Tipperary to provide convenient off-street parking in close proximity to Main St. This parking will complement the reduction in parking to Main St. resulting from the Carrick-on-Suir Regeneration Plan. The aim of the Carrick-on-Suir Regeneration plan is improvements in active travel, sense of place, and pedestrian and vulnerable road users’ use.

By administrator, 22 January, 2024

Demolition of 8 no. existing derelict buildings and boundary walls at the old Goldcrop Site on The Quay, Carrick-on-Suir, Co. Tipperary. The project will involve safe demolition and removal of the derelict buildings, walls and associated structures at the site.

The proposed works will comprise of the following:

• Demolition and removal of 8 no. existing derelict buildings

• Demolition and removal of boundary walls facing onto The Quay

• Demolition and removal of the existing weighbridge located within the Goldcrop site

By administrator, 2 March, 2023

The construction of a multi-denominational Cemetery which shall be enclosed by masonry boundary walls on all sides and include the following: Main (front) Gate & Disability Access Gate; Car park to the front; flexible material cemetery access roads; Access paths to Irish Wheelchair Association Guidelines; Central Reflection Area with seating & planting; Columbarium Walls; Utility Shed & WC;  The proposed development (total of 997 grave plots; 2-burials per plot) shall be constructed over 3 Phases i.e. Ph.1- 522 Plots; Ph.2- 435 Plots; Ph.3- 40 Plots.